4/30/2023 0 Comments Lifting radius of a craneA pre-lift meeting to review the plan, must be held before the actual lift, and be attended by the operator rigger(s), competent person and others as required.Ī Critical Lift Plan and Critical Lift Checklist must be completed by the subcontractor and submitted to Princeton University Project Manager when any of the following conditions exist:.Applicable rigging to be used as well as precautions and safety measures.The name of the Operator, Rigger and Competent Person.The plan may include sketches showing lifting points, methods of attachment, sling angles, load vectors, boom and swing angles, crane orientations, related capacities, and other factors affecting the equipment and lifting operation.